|
|
|
|
| |
 |
|
|
| |
 |
| |
|
System Control Master File: |
| |
 |
Basic information |
| |
 |
Retread
Workorder Controls (Bandag,
Oliver, or Goodyear retreading
system) |
| |
 |
Bill-of-Materials
Default |
| |
 |
RAR
Reasons |
| |
 |
Reject
Reasons |
| |
 |
Re-Run
Reasons |
| |
 |
Final
Inspection Quality Checklist |
|
| |
|
Inventory Data Files: |
| |
 |
Tread Design File |
| |
 |
Tire
Size File |
| |
 |
Brand
Name File |
| |
 |
Raw
Materials File |
| |
 |
Finished
Goods File |
|
| |
|
Retread Shop Order Entry: |
| |
 |
Shop-Floor Workorder Entry
Method |
| |
 |
Begin
workorder |
| |
 |
Inspection
checkpoint |
| |
 |
Repair
checkpoint |
| |
 |
Build
checkpoint |
| |
 |
Final
checkpoint |
| |
 |
Back-Office
Workorder Entry Method |
|
| |
|
Adjustment Claims Processing: |
| |
 |
Batch Print Adjustment Claim
Forms |
| |
 |
Batch
Print Credit Memos |
|
| |
|
Shop Reports: |
| |
 |
Order Status Report |
| |
 |
Production
Summary (week/month/year) |
| |
 |
Tire
Adjustment Order Analysis
|
|
| |
|
|
|
|
|
|